NASA222 頁
組員任務後彙報
NASA不明飛行物體D021雙子星7技術任務歸詢1965年
日期範圍—
出處/單位NASA
NASA 檔案系列中的組員任務後彙報,共 222 頁。下方節錄與重點均自原檔文字層直接抽取。
重要性
NASA 釋出的載人月球或軌道任務語音/彙報紀錄。
相關影像(點擊放大)
查看全部 222 頁 →逐頁重點原文
從每一頁中挑出最具訊號性的句子(含 UAP / 雷達 / 觀察 / 高度 / 座標等關鍵字),保留原文不翻譯以避免失真。
- p.1EN· This document may be exempt from public disclosure under the Freedom of lnfor• mation Act (5 U.S.C. 552)中文· This document may be exempt from public disclosure under the Freedom of lnfor• mation Act (5 U.S.C. 552)
- p.3EN· Although all the material contained in this transcript has been rough edited, the urgent need for the preliminary t ranscript by mission analysis personnel precluded a final edit prior to its publication中文· Although all the material contained in this transcript has been rough edited, the urgent need for the preliminary t ranscript by mission analysis personnel precluded a final edit prior to its publication
- p.4EN·中文·
- p.5EN· Paragraph 1.0 2.0 e TABLE OF CONTENTS Page Number COUNTDOWN 1.1 Crew Insertion. ...................... ............. . 1 1.2 Comm:un.ications . .......•.•.........•...........•..• . 1 l.3 Crew Participation in Countdown....................l l.4 Comfort . .........................................• .1 l.5 Environmenta…中文· Paragraph 1.0 2.0 e TABLE OF CONTENTS Page Number COUNTDOWN 1.1 Crew Insertion. ...................... ............. . 1 1.2 Comm:un.ications . .......•.•.........•...........•..• . 1 l.3 Crew Participation in Countdown....................l l.4 Comfort . .........................................• .1 l.5 Environmenta…
- p.6EN· 14.0 TRAINI NG 14.1 Gemini Missi on Simulator...........•••••••185 14.2 DCPS (Launch abort simulat or) ....•.•••••••191 14. 3 MAC Engineering Simulator........••.••.•••191 14.4 Translation and Docking Tr ainer...•.••••••192 14 . 5 Planet ari um. . ........................••••• •193 14.6 Systems Brief inga...........…中文· 14.0 TRAINI NG 14.1 Gemini Missi on Simulator...........•••••••185 14.2 DCPS (Launch abort simulat or) ....•.•••••••191 14. 3 MAC Engineering Simulator........••.••.•••191 14.4 Translation and Docking Tr ainer...•.••••••192 14 . 5 Planet ari um. . ........................••••• •193 14.6 Systems Brief inga...........…
- p.7EN· LANDING AND RECOVERY 7.1 Impact . ........... ... . ...••.•. •. •.•••••• • • • • • • • • • 54 7.2 Checklists. .............................. • • • • • • • • 55 7.3 Communicatione..••......•••••••••.••.•.••••.•.•••55 7.4 Systems Configuration.•••••··••••••••••••••••••••58 7.5 Spacecraft Status.••••••••••••••••••• •••…中文· LANDING AND RECOVERY 7.1 Impact . ........... ... . ...••.•. •. •.•••••• • • • • • • • • • 54 7.2 Checklists. .............................. • • • • • • • • 55 7.3 Communicatione..••......•••••••••.••.•.••••.•.•••55 7.4 Systems Configuration.•••••··••••••••••••••••••••58 7.5 Spacecraft Status.••••••••••••••••••• •••…
- p.8EN· Insertion Act ivities............................15 Post Station Keeping...........•................17 ORBITAL FLIGHT . ..............••.•................... .18 5.0 RETROFIRE 5.1 TR-2:00 Power Up and Alignment Checklists....... 32 5.2 TR-26 Events............•.....•..••..•.......•..33 5.3 TR-5 GMT Stop Clock.......…中文· Insertion Act ivities............................15 Post Station Keeping...........•................17 ORBITAL FLIGHT . ..............••.•................... .18 5.0 RETROFIRE 5.1 TR-2:00 Power Up and Alignment Checklists....... 32 5.2 TR-26 Events............•.....•..••..•.......•..33 5.3 TR-5 GMT Stop Clock.......…
- p.9EN· 11.0 EXPERIMENTS 11.1 Celestial, Space, and Terrestrial Radiometry (D-4/D-7)•••••••••••••••••••••••••••••••••••140 11.2 Star Occulation Measurement (D-5) •...•.....•146 11.3 Simple Navigation (D-9) .....................148 11.4 Visual Acuity and Astronaut Visibility and Vision Test (M-9) .......................154 1…中文· 11.0 EXPERIMENTS 11.1 Celestial, Space, and Terrestrial Radiometry (D-4/D-7)•••••••••••••••••••••••••••••••••••140 11.2 Star Occulation Measurement (D-5) •...•.....•146 11.3 Simple Navigation (D-9) .....................148 11.4 Visual Acuity and Astronaut Visibility and Vision Test (M-9) .......................154 1…
- p.11EN· Maybe we should try to get that improved sometime. 1.3 Crew Participation in Countdown Borman Again, I think they have been used on 4 or 5 l aunches, and I thought they were fine中文· Maybe we should try to get that improved sometime. 1.3 Crew Participation in Countdown Borman Again, I think they have been used on 4 or 5 l aunches, and I thought they were fine
- p.12EN· Very slow. 1.6 Sounds Borman We had been well briefed on all the soundsz the gimbaling, pre valve, a.nd erector中文· Very slow. 1.6 Sounds Borman We had been well briefed on all the soundsz the gimbaling, pre valve, a.nd erector
- p.13EN· Lovell I thought you could just about put 01P COMM, V1bration, and noise together, because the motion, vibration, and noise all contributed to a definite knowledge that you were going somepl ace中文· Lovell I thought you could just about put 01P COMM, V1bration, and noise together, because the motion, vibration, and noise all contributed to a definite knowledge that you were going somepl ace
- p.14EN· Borman I called it out, but we only rolled,I think,about 2 or 3°. 2.3 Pitch Program Borman The pitch program started just as in the simulator, which is very accurate on this中文· Borman I called it out, but we only rolled,I think,about 2 or 3°. 2.3 Pitch Program Borman The pitch program started just as in the simulator, which is very accurate on this